HomeFeature Requests

Use this forum to ask for new features or suggest changes to the game.

Rounds left message consistency Messages in this topic - RSS

Blinkos
Blinkos
Posts: 11


8/2/2016
Blinkos
Blinkos
Posts: 11
I started a second account (by the way, create a reset account button if possible so someone can reset his progress) cause I thought I liked the chemicals and Uranus more. Anyway, I
happened to have 3-4 upgrades running at the same time. One was an ACP(Structure) which is construction and two were upgrades on existing Chemical Plants.

What I think would be more eye-pleasing would be turns left be kept at a set format. For contruction it is x/y where y is the total and x is the current round. For upgrades it's x rounds left.
The latter seems a lot more appealing that the former. I think that it would help if everything was changed to
"Procedure: x rounds left"
or (if we wanna keep the out-of part)
"Procedure: x out of y rounds left"

Consistency is what I am trying to promote here :P
0 link






Powered by Jitbit Forum 8.3.8.0 © 2006-2013 Jitbit Software