HomeGeneral Discussion

General topics about Barons of the Galaxy

Production Spreadsheet Messages in this topic - RSS

Vagabond820
Vagabond820
Posts: 21


1/22/2017
Vagabond820
Vagabond820
Posts: 21
I made a spreadsheet in Open Office for BotG.

It allows you to track the per turn resource requirements and productions. Simply select the building types, set its level, and set the resource level for resource producing structures. All selections are from the drop downs with structures organized by Type (Mine, Metal, Ect.) except the HQ as you must manually configure the HQ. Note: Resource drop down get obscured if you are not scrolled all the way to the left.

The front sheet is protected but lacks a password as does the document.

Hope people find this helpful.


+1 link






Powered by Jitbit Forum 8.3.8.0 © 2006-2013 Jitbit Software